Quote Originally Posted by CA Jack View Post
Okay, here is where the confusion is: I screw the 2x2 onto the front panel first, not to the base.




I allow for enough overhang ... and get the 2x2 screwed onto the front first, then I screw the front & back panels onto the bottom ... then I put on the sides.

Jack
Yes, yes, but, when I cut the front and back panel to 26'' the add the 2x2's to the fron and back, the 2x2's don't line up with the base edge, it's too wide. The overhang is good on the top and bottom, but the panel's with the 2x2's attached are to wide to attach them to the base. I will post pics of what I'm saying in the A.M
.